Showing posts with label ROV. Show all posts
Showing posts with label ROV. Show all posts

Saturday, August 27, 2011

New Circuit Board



When I stumbled across these small, dual channel, "metal-oxide-semiconductor field-effect transistors" (MOSFETs) online, I knew I had to use them somehow. As the Electrical engineer for our team, I've set myself on a mission to make each ROV faster, more efficient, more economical, and more compact. This new circuit board is a great example of that. These three dual channel surface mounted MOSFETs are almost half the price of the single channel MOSFETs we used for last year's Relay switching board, take up significantly less space (this one interfacing board does the job of three of our interfacing boards last year), and finally, the new design allows us to add an extra H-bridge on our submersible board, giving us a ROV that should be more maneuverable and more efficient.

-Michael Ikegami

Friday, June 10, 2011

Electrical Schematics completed!

I've finally completed our electrical schematics for our 2012 MATE ROV bot. They were specially designed to be compact enough to fit inside a 3" pressure housing. This year I'm experimenting with all kinds of different technologies, such as surface mount devices and double layer PCBs. Electrically, this year's bot will be similar to last year's. We will have an "extended H-Bridge" (direction control bottomside and potentiation control topside) controlling our Z-Axis motor group, individual H-Bridges bottomside for both of the X axis motors (A new feature on this year's bot), as well as H-Bridge style control for the manipulator (which allows us to throttle speed to our heart's content). All in all, the control system for this year's project will allow us to achieve maximum controlablity and speed, while being the most compact control system Tachyon Robotics has ever created (albeit the third). We've also created room for 3 sensors and a pressure sensor, which gives us a lot of leeway to incorporate the special tools required to solve the tasks provided by MATE. All essential electrical work should be done in the next 2 weeks!

- Michael Ikegami